Ok. so I'm up way too late already, but since I got started on thsi I figured I might as well finish it, because otherwise I don't know when I will get to. Here are some pictures of out bathroom project progress. These pictures area already outdated, as I just finished the rough drywall as of the beginning of this week. So far we have passed the following inspections:
1) Rough Plumbing
2) Rough Electrical
3) Framing
4) Insulation
5) Drywall
These pictures were taken after the first three inspections but before I finished the insulation. I will have to take more up-to-date pictures soon and post them as well, since it is very difficult to really get a feel for what you are looking at in these pictures (unless you have a decent amount of construction experience).
The north side of the room where the toilet and tub are, and the service access corridor is.

In the Bathroom looking out at the entrance doorway.

The north wall where the tub and toilet are.

The tub/shower area.

The vanity area.

The south wall/vanity area.

The closet (already full of junk).